Back to Blog
    Guides
    August 2, 2026

    Post-Construction Cleaning Checklist: Every Step Before Move-In

    Use this checklist to confirm nothing gets skipped between the last trade leaving and the first box coming in. It is the same sequence our crews follow on renovation and new-build jobs across Miami, Fort Lauderdale, and Palm Beach.

    Whole home

    • Bulk debris and packaging hauled off site
    • Ceilings, walls, and corners dusted top-down
    • HEPA-vacuum of every hard surface and floor
    • Baseboards, casings, door frames, and trim hand-wiped
    • Vent registers and returns wiped clean
    • Switch plates, outlets, fixtures, and ceiling fans detailed
    • Interior windows, frames, and tracks cleaned
    • Stickers, labels, tape, and adhesive residue removed
    • Closets and shelving wiped inside

    Kitchen

    • Cabinet interiors, drawers, and shelves vacuumed and wiped
    • Appliance interiors and exteriors cleaned, protective film removed
    • Countertops, backsplash, and grout lines detailed
    • Sink basin and faucet polished
    • Floors mopped with a finish-safe solution

    Bathrooms

    • Grout haze and construction residue removed from tile
    • Tubs, showers, and glass doors cleaned streak-free
    • Toilets, vanities, and mirrors detailed
    • Chrome and fixtures polished
    • Exhaust fans dusted

    Final walkthrough

    • Punch list reviewed with the GC, designer, or homeowner
    • Touch-ups completed on the spot
    • All trash removed from the property
    • Property confirmed photo-ready for listing or staging

    A note on timing

    Schedule the final clean after every trade is done. One more sanding pass or a late fixture install will put dust right back on freshly detailed surfaces, and you will pay twice.

    Want us to run this checklist on your project? Call or text (954) 329-0092 or see our post-construction cleaning service.

    Related reads

    $30 off your first clean — code FIRST30